The facilities <strong>and</strong> equipment include counting rooms, a personnel decontamination facility,<br />
an instrument hot shop, <strong>and</strong> an access control station, as well as the various types <strong>of</strong><br />
radiation monitoring instrumentation. This includes the laboratory, portable, air, individual<br />
<strong>and</strong> emergency radiation monitoring equipment that will be available at the <strong>Barakah</strong> facility.<br />
FANR concludes that Chapter 12 <strong>of</strong> the PSAR, along with supplemental application<br />
materials, demonstrates the compliance with relevant regulatory requirements, contained<br />
primarily in FANR-REG-03, FANR-REG-04, <strong>and</strong> FANR-REG-11. FANR concludes that there<br />
is a sufficient basis for establishing that expected doses will be within established dose limits<br />
for workers <strong>and</strong> members <strong>of</strong> the public, <strong>and</strong> for demonstrating that the plant design is<br />
ALARA.<br />
FANR will conduct further review <strong>of</strong> source terms used in shielding <strong>and</strong> the contamination<br />
control <strong>and</strong> minimization <strong>of</strong> waste program during construction.<br />
5.16 Chapter 13 - Conduct <strong>of</strong> Operations<br />
Chapter 13 <strong>of</strong> the PSAR describes the proposed conduct <strong>of</strong> operations which includes<br />
management <strong>and</strong> support organizational structure, staffing levels, qualification requirements,<br />
contractor relationships, training <strong>and</strong> procedures programs for plant staff, <strong>and</strong> internal review<br />
<strong>and</strong> audit processes, including auditing <strong>of</strong> the quality assurance <strong>and</strong> emergency planning.<br />
The PSAR describes corporate functions, including executive management involvement with<br />
the project; the division <strong>of</strong> responsibility between ENEC <strong>and</strong> the prime contractor; ENEC’s<br />
organizational definitions, management controls, <strong>and</strong> responsibilities <strong>of</strong> key management<br />
personnel; <strong>and</strong> the personnel qualification requirements to support design, construction, <strong>and</strong><br />
initial testing for <strong>Barakah</strong> <strong>Units</strong> 1 <strong>and</strong> 2.<br />
The PSAR describes plant staff training plans <strong>and</strong> programs <strong>and</strong> procedure development<br />
plans that facilitate qualification <strong>of</strong> personnel <strong>and</strong> help to guide safe, reliable, <strong>and</strong> efficient<br />
plant operation. In addition to plant operation, the training <strong>and</strong> procedure plans <strong>and</strong><br />
programs reviewed are applicable to administrative controls, plant maintenance, emergency<br />
preparedness, testing, security, <strong>and</strong> radiation protection.<br />
The purpose <strong>of</strong> the ENEC’s internal review <strong>and</strong> audit program is to confirm that internal<br />
audits <strong>and</strong> independent reviews <strong>of</strong> the management system, including the quality assurance<br />
program, across all levels <strong>of</strong> the organization are adequately planned, scheduled, <strong>and</strong><br />
conducted.<br />
The PSAR states that ENEC’s emergency planning <strong>and</strong> preparation include planning <strong>and</strong><br />
design process, <strong>and</strong> the organizational capability to adequately execute the plan in response<br />
to emergency situations.<br />
FANR concludes that Chapter 13 <strong>of</strong> the PSAR, along with supplemental application<br />
materials, demonstrates the compliance with relevant regulatory requirements, contained<br />
primarily in FANR-REG-01, FANR-REG-02, FANR-REG-03, FANR-REG-06, FANR-REG-12,<br />
<strong>and</strong> FANR-REG-17.<br />
FANR will conduct further review <strong>of</strong> the development <strong>of</strong> the elements <strong>of</strong> emergency planning<br />
for operation, during construction.<br />
5.17 Chapter 14 - Initial Test Program