12.07.2015 Views

C21e tile installation guide - Solarcentury

C21e tile installation guide - Solarcentury

C21e tile installation guide - Solarcentury

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>tile</strong>5. <strong>C21e</strong> Installation continued5.4 Checking the <strong>C21e</strong> Cable Connections• At the top of each column, ensure that the <strong>C21e</strong> cables are left in anaccessible position. They will be connected later in the <strong>installation</strong>.<strong>Solarcentury</strong> recommends that a string check is carried out for each column tocheck the cable connections (Diagram 8).• To carry out a string check follow the instructions in Appendix 3.Part Number 14177-0115WARNING: Always use safety leads with the string checker.Never use standard meter probes to avoid risk of electrocution.Diagram 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!