12.07.2015 Views

About Us - Lauren Engineers & Constructors

About Us - Lauren Engineers & Constructors

About Us - Lauren Engineers & Constructors

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Power“Designing & Building Success”510 MW Simple Cycle Power FacilityOld Dominion Electric CooperativeLouisa County, Virginia<strong>Lauren</strong> was responsible for the greenfield installation of 4 dual fuel GE 7EA’s and 1 dual fuelGE 7FA combustion turbine. Project scope also included fuel unloading and storage facility, gasconditioning equipment, startup and commissioning and plant building. This was a fast-track projectwith a 14-month schedule from award to commercial operation.Project ContactJerry Hobbs865-246-1136jerry.hobbs@laurenec.com901 South First Street • Abilene, TX 79602 • 325-670-9660 • laurenec.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!