Power“Designing & Building Success”Combined Cycle Power PlantAssoc. Electric Coop./Siemens Westinghouse Power Corp.Campbell, MissouriThis combined cycle project at St. Francis Power Station added 245 MW of power utilizing two(2) Siemens V84.3A, two (2) Siemens steam turbines, and two (2) ATS HRSGs. Detailed engineeringscope included site work, foundations, underground mechanical and electrical, and critical pipingsystems.Project ContactClint Rosenbaum325-734-3717clint.rosenbaum@laurenec.com901 South First Street • Abilene, TX 79602 • 325-670-9660 • laurenec.com