12.07.2015 Views

Download - Hitachi Power Europe GmbH

Download - Hitachi Power Europe GmbH

Download - Hitachi Power Europe GmbH

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Combined Cycle <strong>Power</strong> PlantsNyíregyházaand MalmöTailor-made combinedcycle power plantsTechnical data for Malmö■■Capacity: 440 MWe,408 MWth district heating■■Configuration:1 x Gas turbine, 1 x HRSG,■■1 x Steam turbine, Multishaft■■In operation: since 2009■■Scope of supply:Consortium leader, BOP,civil, electrical, constructionand commissioningTechnical datafor Nyíregyháza■■50 MWe, 64 MWth districtheating (additional)■■Configuration:1 x H-25 GT, 1 x HRSG(2 pressure boiler withsupplementary firing),1 x ST■■In operation:since 2007■■Scope of supply:Turnkey includingconstructionand commissioningwww.hitachi-power.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!