Flue Gas CleaningEemshaven A & BFlue gas cleaningfor 2 x 800 MWe (net)bit-coal-fired power plantTechnical data■■Design flue gas flow per unit:2,200,000 m 3 / h std. wet■■ESP: 5 fields, 4 passes■■ID Fan: 2 stage axial fan 11.4 MW■■Max. SO 2Concentration:4,736 mg / m 3■■SO 2Removal Efficiency: 98 %■■Waste water flow: 2 x 28 m 3 / h■■In operation: 2014■■Scope of supply:ESP, ID Fan, FGD,FGD waste water treatmentwww.hitachi-power.com