12.07.2015 Views

new at HERZ - Herz Valves UK

new at HERZ - Herz Valves UK

new at HERZ - Herz Valves UK

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Panorama<strong>HERZ</strong> training programme 2003TopicDur<strong>at</strong>ionAdjustment of roomtemper<strong>at</strong>ure and he<strong>at</strong>ing 4 hoursContent: Room temper<strong>at</strong>ure controllers, drivesand probes, thermost<strong>at</strong>ic heads and valves,he<strong>at</strong>ing control, 3-way valves and motorsHydraulic, hydraulic balancing 4 hoursContent: Circuit regul<strong>at</strong>ing valves, differentialpressure controllers, flow r<strong>at</strong>e controllers,overflow valves, measuring computersRadi<strong>at</strong>or connection2 hoursContent: Thermost<strong>at</strong>ic and return valves,thermost<strong>at</strong>ic series De Luxe, connection systems,three and four-way valves, radi<strong>at</strong>orcontrol valves AS/GP, Changefix changingtool, distributors for radi<strong>at</strong>or connectionSystem inform<strong>at</strong>ion2 hoursContent: Two and one-pipe systems, <strong>new</strong>install<strong>at</strong>ions, reconstruction/renov<strong>at</strong>ionReconstruction and back-setting 2 hoursContent: <strong>HERZ</strong> energy saving, report on theresults of the "Komárno/SK" project, energysaving by thermost<strong>at</strong> controlFloor he<strong>at</strong>ing systems2 hoursContent: Distributors for floor he<strong>at</strong>ing systems,he<strong>at</strong>ing circuit control, floor he<strong>at</strong>ingcontrol, return temper<strong>at</strong>ure controlSkirting boardsContent: Skirting board system1 hoursConnection system2 hoursContent: "Pipe fix" press fitting system,compression units, pipe fittings, MKW pipesSanitary1 hoursContent: Sanitary distributor, shutoff andregul<strong>at</strong>ing valves for drinking w<strong>at</strong>er, limit<strong>at</strong>ionof circul<strong>at</strong>ing temper<strong>at</strong>ure, install<strong>at</strong>ion ofcircul<strong>at</strong>ion pipingDr. Gerhard Glinzerer, managing director of<strong>HERZ</strong>, and headmistress and member ofparliament, Gulchohra Mamedova cut theribbon in front of the entrance of the <strong>new</strong>labor<strong>at</strong>ory of the university for constructionand architecture in Baku, which wassponsored by <strong>HERZ</strong>.<strong>HERZ</strong> AzerbaijanAustrian technical expertise is very popular in Azerbaijan –the student labor<strong>at</strong>ory in Baku is equipped with <strong>HERZ</strong> productsOn 5 th June 2003 <strong>at</strong> a solemn ceremonywhich was broadcast in the st<strong>at</strong>e <strong>new</strong>s,<strong>HERZ</strong> managing director, Gerhard Glinzerer,handed over a labor<strong>at</strong>ory fully equippedwith <strong>HERZ</strong> products to the professorsand students of the university for constructionand architecture in Baku, Azerbaijan.An Azerbaijani tradition requiresthe planting of a tree for all major events –and this was duly observed.Cooling2 hoursContent: Thermost<strong>at</strong>ic mix and switchingvalves, cooling ceiling and fan coil fittingsSoftware5 hoursContent: CH 3000 programme training(calcul<strong>at</strong>ion programme for he<strong>at</strong>ing install<strong>at</strong>ionwith <strong>HERZ</strong> valves)Fuel engineeringContent: Biomass he<strong>at</strong>ing units*3 hoursPower engineering3 hoursContent: Storage systems, solar collectors** training takes place <strong>at</strong> the <strong>HERZ</strong> loc<strong>at</strong>ion in Sebersdorf,Styria/AustriaRecommended dur<strong>at</strong>ion of training:maximum 5 hours per day.3/2003 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!