12.07.2015 Views

WB-9 - Paschim Banga Sarva Shiksha Mission - Sarva Shiksha ...

WB-9 - Paschim Banga Sarva Shiksha Mission - Sarva Shiksha ...

WB-9 - Paschim Banga Sarva Shiksha Mission - Sarva Shiksha ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Page 6 of 6Package No. <strong>WB</strong>-93.2 The consultant shall carry out independent testing (field and laboratory) ofconstruction materials and will report to VEC/WEC/MC/Field/District levelEngineer under SSA with his suggestions and remedial measures, if any.3.3 The consultant shall also verify that all the points raised in inspection and auditnote shall be strictly complied by VEC/WEC/MC/Field/District level Engineer to hissatisfaction.3.4 On completion of work, consultant shall issue completion certificate.4. GOVERNING FACTORS4.1 The job of consultancy for technical supervision, monitoring and qualityassurance shall be combination of field visits, testing of materials, office work,comments on construction materials, checking of test results.4.2 The consultant shall review the degree of quality control exercised during theconstruction through various tests. The purpose of quality control exercise is toensure that the work has been executed according to the drawings, designs andspecifications and in line, level and as per approved drawings.4.3 The consultant shall timely carry out independent checking/testing of materialsafter collecting random sample in the presence of Field/District level Engineerunder SSA to ensure that specified quality is achieved. The tests to be carriedare listed below.New School Buildings, Additional Class Toilet Blocks, Boundary WallRooms and Circle Resource Centres1. Water2. Cement3. Sand4. Kapachi & Metal5. Brick/CC Block/Bela Stone6. Reinforcement7. Cement Concrete Cubes8. Flooring Tilesand Major Repair1. Water2. Cement3. Sand4. Kapachi & Metal5. Brick/CC Block/Bela Stone6. Cement Concrete Cubes7. PVC PipesThe types and no. of tests required to be carried out for materials/concrete etc.are enclosed as Annexure-B. However, for multilevel building, cube testing forconcrete is required to carry out for each storey slab as well as column andfooting concrete.4.4 The consultant shall furnish details about the testing equipment, skilled andunskilled persons engaged by him for testing of samples with their qualificationsand experience.4.5 The consultant having wide experience of similar nature of work, if has no facilityof laboratory for material testing shall carry out MoU with the Governmentapproved material-testing laboratory. In such case, both the partners shouldjointly and severally responsible for whole work so their inter-relationship shouldbe clearly stated with the documentary evidence. The firm having mobile testinglaboratory shall be given additional weightage, as it will ensure testing ofmaterials at site of work.4.6 The consultant shall provide methodology for supervision, certification andtesting of materials.4.7 Under this project, Civil Works are undertaken either through VEC/WEC/MC, i.e.,involving the community. The consultant shall motivate the community and ifrequired train the masons at site.4.8 The consultancy team shall have considerable strength of expertise andestablish tract record of providing technical audit and quality assurance services.The consultant shall appoint minimum B.E. Civil two Engineers for the districts of

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!