12.07.2015 Views

GPR-18 MS ATEX Explosion Proof PPB Oxygen Analyzer.

GPR-18 MS ATEX Explosion Proof PPB Oxygen Analyzer.

GPR-18 MS ATEX Explosion Proof PPB Oxygen Analyzer.

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Advanced Instruments Inc.Procedure:1. Disconnect the AC power source before servicing the analyzer.2. Insert the power cable through the user supplied approved conduit fitting on the left side of the analyzer.3. Insert the output cable(s) through the user supplied approved conduit fittings on the right side of the analyzer.4. Strip the ends of the wires approximately ¼ inch.5. Remove the safety cover plate.6. Loosen the terminal screws, insert the bare wire into the appropriate terminals and re-tighten with a small bladedscrewdriver.7. Note: If equipped with the optional temperature controlled heater system, the necessary wiring has been installed at thefactory and no additional connections are required. The power connection services both the analyzer electronics andtemperature controlled heater system.8. Caution: Connect the power ground directly to the ground terminal on the inside of the analyzer case.9. Replace the safety cover plate.10. Pack and seal the power and interconnection wiring as described in Appendix A.11. Establish power as directed below.17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!