12.07.2015 Views

Amendments to the Terminal Operating Guidelines ... - Transnet

Amendments to the Terminal Operating Guidelines ... - Transnet

Amendments to the Terminal Operating Guidelines ... - Transnet

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

7.1.3.4 7.1.3.2.2 <strong>the</strong> berthing of vessels of less than eighty thousand (80,000)Dead Weight Ton (DWT) and/or vessels with mast poles willbe permitted at <strong>the</strong> discretion of TPT, whose writtenauthorisation for such berthing is required. Detailedinformation of such a vessel is a required from <strong>the</strong> Cus<strong>to</strong>meror representative and such information must be presented <strong>to</strong>TPT, and a period of one (1) working day must be allowedfor confirmation of <strong>the</strong> acceptance of such vessel. Thedecision <strong>to</strong> proceed will be effective immediately.7.1.3.5 7.1.3.2.3 <strong>the</strong> minimum vessel cargo uplift is restricted <strong>to</strong> eightythousand (80 000) <strong>to</strong>ns:for vessels of less than 80,000 DWT,<strong>the</strong> minimum hatch opening for loading in<strong>to</strong> holds must betwenty (20)m long by fourteen (14)m wide.7.1.4.1 The maximum permissible age of a vessel scheduled forloading at <strong>the</strong> BTS is twenty five (2520) years from ex dockyard.Clause 8: Cape Town <strong>Terminal</strong>s incorporating:Old ClauseNo.New ClauseNo.Clause content8.1.2.1 TPT, in <strong>the</strong> interests of maximising Port capacity, and in dealingwith wind bound vessels at <strong>the</strong> Container terminal, has undertaken<strong>to</strong> divert vessels from <strong>the</strong> Container <strong>Terminal</strong> <strong>to</strong> CTAR. In doing soTPT will consider <strong>the</strong> interests of all stakeholders and <strong>the</strong>scheduling and planning of diverted vessels will consider <strong>the</strong> callsize, stack availability and all relevant fac<strong>to</strong>rs so as <strong>to</strong> limitprejudicing any normally scheduled CTAR vessel calls<strong>Terminal</strong> <strong>Operating</strong> <strong>Guidelines</strong>: Version 3 – <strong>Transnet</strong> Port <strong>Terminal</strong>s Ro-Ro, Break-bulk, Bulk and Agricultural <strong>Terminal</strong>s: 1 April2013 synopsis of amendments: TRANSNET PORT TERMINALS, A DIVISION OF TRANSNET SOC Ltd

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!