12.07.2015 Views

English - Energy Efficiency Guide for Industry in Asia!

English - Energy Efficiency Guide for Industry in Asia!

English - Energy Efficiency Guide for Industry in Asia!

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• How staff will be <strong>in</strong><strong>for</strong>med to ensure their assistance dur<strong>in</strong>g the pre-assessment (see task 1b)In<strong>for</strong>mation on the CD-ROM and website:• Company examples (see Appendix A) <strong>for</strong> examples of companies that participated <strong>in</strong> the GERIAPproject on how they addressed the meet<strong>in</strong>g with top management• Worksheets (Worksheet 1, 2 and 3, See Appendix B)1b. Form a Team and <strong>in</strong><strong>for</strong>m staffPart 2How to Become <strong>Energy</strong>EfficientA Team of 4 - 6 people should be <strong>for</strong>med. In practice, the Team is often <strong>for</strong>med at the meet<strong>in</strong>g with topmanagement.The Team normally <strong>in</strong>cludes (but can be expanded when the focus areas have been selected):• Someone who knows the ma<strong>in</strong> energy uses and environmental impacts of the company, e.g. theEnvironment Manager or <strong>Energy</strong> Manager• Someone who knows the production process, e.g. the Head of Production• Someone with access to general company <strong>in</strong><strong>for</strong>mation and energy cost data, e.g. the company’sAccountant or F<strong>in</strong>ance Manager• A communications or tra<strong>in</strong><strong>in</strong>g person, especially if management have identified staff tra<strong>in</strong><strong>in</strong>g asone of their objectives• A top management representative who normally is not part of the Team’s day-to-day workThe company may decide to also <strong>in</strong>clude an external facilitator (consultant or service provider) <strong>in</strong> theTeam <strong>for</strong> the pre-assessment and writ<strong>in</strong>g of the proposal, especially if he/she/they are needed <strong>for</strong> theassessment later.The Team holds a half-day first meet<strong>in</strong>g to agree on each member’s roles (see Worksheet 4) how andwhen to carry out the pre-assessment (task 1c), select focus areas (task 1d), and write a proposal <strong>for</strong>management (task 1e).In addition, the Team should <strong>in</strong><strong>for</strong>m staff about the pre-assessment, <strong>for</strong> example through a letter by topmanagement, regular staff meet<strong>in</strong>gs or notice boards.In<strong>for</strong>mation on the CD-ROM and website:• Company examples (see Appendix A) <strong>for</strong> examples of companies that participated <strong>in</strong> the GERIAPproject on how they addressed the Team <strong>for</strong>mation and <strong>in</strong><strong>for</strong>m<strong>in</strong>g staff• Worksheets (Worksheet 4, see Appendix B)1c. Pre-assessment to collect general <strong>in</strong><strong>for</strong>mationThe Team now carries out a pre-assessment at company level to collect and review general <strong>in</strong><strong>for</strong>mation,which normally takes between 1-3 days. The ma<strong>in</strong> purpose of the pre-assessment is to identify wherethe biggest areas <strong>for</strong> energy sav<strong>in</strong>gs are (= potential focus areas <strong>in</strong> task 1d!) and writ<strong>in</strong>g a realisticproposal to top management (task 1e).This <strong>in</strong><strong>for</strong>mation can be obta<strong>in</strong>ed through exist<strong>in</strong>g documentation and computer systems, <strong>in</strong>terviewswith staff, a walkthrough of the plant, and simple monitor<strong>in</strong>g. Because staff were <strong>in</strong><strong>for</strong>med about thepre-assessment, they are more likely to cooperate!In<strong>for</strong>mation collected should <strong>in</strong>clude:• General company details, such as address, number of staff, work<strong>in</strong>g hours and production capacity(see Worksheet 5)• Organization chart with the different departments and ma<strong>in</strong> functions• General production flow chart <strong>for</strong> the whole company with the ma<strong>in</strong> <strong>in</strong>puts and outputs <strong>for</strong> each22<strong>Energy</strong> <strong>Efficiency</strong> <strong>Guide</strong> <strong>for</strong> <strong>Industry</strong> <strong>in</strong> <strong>Asia</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!