ShutdownOnce the desired amount <strong>of</strong> feed has been filtered the Model L should beshutdown according to the following steps:1. Relieve pressure in system by fully opening pressure control valve [12].2. Press the “STOP” button on the control panel [17] to turn <strong>of</strong>f the system pump.3. Open the reservoir drain valve [21] to rinse the solution out <strong>of</strong> the system.4. Close the reservoir drain valve.5. Fill reservoir with de-ionized (DI) water.6. Turn on pump by pressing “FWD” on pump controller.7. Adjust pump speed to desired operating conditions using the up and down arrows on thecontroller.8. Slowly close pressure control valve to build up system. Stop increasing the pressure oncefluid begins to flow through the permeate line [11].9. Allow DI water to circulate for several minutes.10. Relieve pressure in system by fully opening pressure control valve.11. Press the “STOP” button on the control panel to turn <strong>of</strong>f the system pump.12. Open the reservoir drain valve to rinse the DI water out <strong>of</strong> the system.13. Close the reservoir drain valve.14. Turn <strong>of</strong>f the flow <strong>of</strong> water circulating through the heat exchanger by closing the heatexchanger inlet valve [5].15. Unplug the pump power cord [18].16. Close the main building water supply valve (ball valve).17. Verify that the membrane has been cleaned and stored in the proper solution – seemembrane documentation.18. Drain system feed tank, store contents as required. Follow chemical / waste storageprocedures as outlined in section 1 on safety.19. Flush system with D.I water per flush procedure.20. Store membrane in preservative as required.21. Label all chemical storage as outlined in section 1.22. Unplug power cable.38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!