FlushThis step is used after Production and every CIP step.1. Stop feed supply coming to system.2. Connect the CIP water (D.I water) supply to system.3. Set the system to run as it would in recirculation with the exception <strong>of</strong> running thePermeate and Concentrate lines to the drain.4. Run the system as you would in recirculation procedure.5. As the tank level drops CIP water will flow into the feed tank and flush out thesystem.NOTE: It will be necessary to flush the membranes out with the feed pump running above50% and HV-3014 nearly fully open. This will ensure that a high flow rate is passingover the membrane surface for cleaning purposes..6. Once the water exiting the drain line becomes clean and pH neutral you candiscontinue the flush and return the Permeate and Concentrate lines to the feed tankand prepare for CIP.Emergency ShutdownIn an emergency, do not worry about the pressure. Just select the stop button on the feedpump.40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!