12.07.2015 Views

Public Environment Report Tarkine Forest Drive ... - Transport

Public Environment Report Tarkine Forest Drive ... - Transport

Public Environment Report Tarkine Forest Drive ... - Transport

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

IDFGHIJKLSectionDescriptionBlackwater RoadGravel section south westof Kununnah BridgeBlackwater and SumacRoadsSealed section atKununnah BridgeSumac RoadKununnah Bridge seal toJulius River sealSumac Roadsealed section at JuliusRiverSumac RoadJulius River seal to RapidRiver RoadRapid River RoadSumac Road to TayateaRoadTayatea RoadRapid River Road tosealed section at TayateaBridgeLengthVegetation ClearanceProposed Pavement Works Proposed Other Works(km) (Hectares)2.454.477.21.464.5117.437.38Reshape and seal the existingroad.Repair minor pavementfailures.Reshape, with localisedwidening, strengthen and sealthe existing road.Repair minor pavementfailures.Reshape, with localisedwidening, strengthen and sealthe existing road.Reshape, widen, strengthenand seal the existing road.Reshape, widen, strengthenand seal the existing road.Modification to accesses to match thepavement works.Light coloured seal over part of section.Install rumble strip groups at some junctionsand access.Seal access to existing TAM operations.Install rumble strip groups at some junctionsand access.Excavation and embankment to allow forthe pavement widening at one location.Seal access to camping area.Modification to junctions so that the priorityof the junctions is along <strong>Tarkine</strong> <strong>Forest</strong><strong>Drive</strong> and not aligned with forestryoperations.Replace the deteriorated bridge over RapidRiver with a concrete bridge.Replace deteriorated log culverts on two unnamedtributaries of Lawson Rivulet.Excavation and embankment to allow forthe pavement widening at approximately 50locations.Modification to junctions so that the priorityof the junctions is along <strong>Tarkine</strong> <strong>Forest</strong><strong>Drive</strong> and not aligned with forestryoperations.Modification to accesses to match thepavement works.Extend culverts to allow for earthworks.Excavation and embankment to allow forthe pavement widening at approximately 5locations.No vegetation clearancerequired for proposedworks.No vegetation clearancerequired for proposedworks.0.10No vegetation clearancerequired for proposedworks.No vegetation clearancerequired for proposedworks.4.740.33Ref: HB09080H001 PER <strong>Tarkine</strong> <strong>Drive</strong> 33P Rev 00/DL/CL/jw 19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!