12.07.2015 Views

Public Environment Report Tarkine Forest Drive ... - Transport

Public Environment Report Tarkine Forest Drive ... - Transport

Public Environment Report Tarkine Forest Drive ... - Transport

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.5 Tourism infrastructure worksThe proposed tourism infrastructure works are described in Table 2.2.No vegetation clearance will take place for the proposed tourism infrastructure works.The location of the proposed tourism infrastructure works are depicted in Appendix A.Table 2.2 - Proposed tourism infrastructure worksSegment Location Proposed WorksG Kanunnah BridgeConstruct and seal a car park for 1 bus andup to 10 cars on the southern side of theArthur River.Install an interpretation sign.G Sumac Lookout Car Park Reseal the existing car park.1. Seal the existing car park.2. Construct and seal bus bays on Sumac Roadadjacent to the toilet.3. Improve the path from the bus bays to thetoilet4. Replace the existing toilet with doubleI Julius River Reserve composting toilet.5. Construct a path from the existing car parkto the toilets6. Construct an additional shelter 3m by 3mincluding concrete base.7. Convert all wood BBQs to gas burning BBQInstall an interpretation sign.J Lake ChisholmConstruct and seal car park 1100 m 2 for 2buses and 10 cars.Construct paths from the car park and busbays to the toiletConstruct a double composting toiletInstall an interpretation sign.2.6 Roadkill mitigation worksThe <strong>Tarkine</strong> <strong>Forest</strong> <strong>Drive</strong> includes substantial roadkill mitigation works – these aredescribed further in Section 6 of this PER.2.7 Construction programThe construction season on the west coast is very short and timing is important tocomplete the project within the specified time periods.Work is expected to begin during 2013, with the total project completed after thesecond year of construction.2.8 Ongoing maintenanceDIER Roads and Traffic Division will assume the maintenance of the new road uponcompletion. Regular monitoring (as a minimum on a weekly basis) by maintenancecrews will improve surveillance and identify issues as early as possible.Ref: HB09080H001 PER <strong>Tarkine</strong> <strong>Drive</strong> 33P Rev 00/DL/CL/jw 29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!