12.07.2015 Views

Public Environment Report Tarkine Forest Drive ... - Transport

Public Environment Report Tarkine Forest Drive ... - Transport

Public Environment Report Tarkine Forest Drive ... - Transport

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1. General informationFor convenience, each major section of this document is prefaced in blue font with therelevant extract of the guideline requirements. A full copy of the final guidelines canbe found at the end of Volume 2 of this PER, in Appendix E.This must provide the background and context of the action including:The title of the actionThe full name and postal address of the designated ProponentA clear outline of the objective of the actionThe location of the action (including maps of the locations of all supportinginfrastructure such as quarries, access tracks and temporary storage facilities)The background to the development of the actionHow the action relates to any other actions (of which the Proponent shouldreasonably be aware) that have been, or are being, taken or that have beenapproved in the region affected by the action, including current andanticipated linking road works or transport routes)The current status of the actionThe consequences of not proceeding with the action.1.1 Title of the actionThe title of the proposed action is the <strong>Tarkine</strong> <strong>Forest</strong> <strong>Drive</strong>.The <strong>Tarkine</strong> <strong>Forest</strong> <strong>Drive</strong> referral was received by the Department of Sustainability,<strong>Environment</strong>, Water, Populations and Communities on the 25 th November 2011 andformally entered into their system (being allocated the reference number 2011/6210)on the 1 st December 2011.1.2 ProponentThe project proponent is:Department of Infrastructure, Energy and Resources (DIER)(Contact: Andrew Fowler, Senior Project Manager)GPO Box 936Hobart, TAS 70011.3 ObjectiveThe fundamental objective of this project is to improved accessibility to the region forthe general public and tourists. In fulfilling this objective, DIER intend to:1.4 LocationSeal the existing Circular Head Council and DIER roads to provide three choices ofself drive routes through the <strong>Tarkine</strong>Widen the road to cater for buses within the Arthur Pieman Conservation Area andsemi-trailer tucks where the road abuts State <strong>Forest</strong>Provide a road which will have a good safety performanceUpgrade tourist facilities, to the extent that it is possible within the projectbudget, at Kanunnah Bridge, Sumac Lookout Car Park, Julius River Reserve andLake Chisholm.The location of the <strong>Tarkine</strong> <strong>Forest</strong> <strong>Drive</strong> is shown in Figure 1.1. The nearest townshipsare Arthur River in the west and Trowatta in the east. There are no major towns in theimmediate vicinity. The nearest major towns are Smithton, approximately 30 km to thenorth of the area, and Wynyard, approximately 45 km to the northeast.Ref: HB09080H001 PER <strong>Tarkine</strong> <strong>Drive</strong> 33P Rev 00/DL/CL/jw 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!