12.07.2015 Views

Sealed item rate quotations are invited for the following work on ...

Sealed item rate quotations are invited for the following work on ...

Sealed item rate quotations are invited for the following work on ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IIIT DELHI,3 RD FLOOR, LIBRARY BUILDING,NSIT CAMPUS, SECTOR-3,DWARKA, NEW DELHI-110078NOTICE INVITING QUOTATION (SHORT TERM)<str<strong>on</strong>g>Sealed</str<strong>on</strong>g> <str<strong>on</strong>g>item</str<strong>on</strong>g> <str<strong>on</strong>g>rate</str<strong>on</strong>g> <str<strong>on</strong>g>quotati<strong>on</strong>s</str<strong>on</strong>g> <str<strong>on</strong>g>are</str<strong>on</strong>g> <str<strong>on</strong>g>invited</str<strong>on</strong>g> <str<strong>on</strong>g>for</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>following</str<strong>on</strong>g> <str<strong>on</strong>g>work</str<strong>on</strong>g> <strong>on</strong> behalf of Board of Governors,IIIT-D from <str<strong>on</strong>g>the</str<strong>on</strong>g> approved and eligible c<strong>on</strong>tractors of specialized job having <str<strong>on</strong>g>the</str<strong>on</strong>g> experience of SITC ofHybrid Type Evaporative cooling system <str<strong>on</strong>g>for</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>following</str<strong>on</strong>g> <str<strong>on</strong>g>work</str<strong>on</strong>g> so as to reach <str<strong>on</strong>g>the</str<strong>on</strong>g> office of undersignedup to 3.00 P.M. <strong>on</strong> 02-06-2009. Quotati<strong>on</strong>s shall be opened <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> same day at 3.30 P.M. in Room No.301, Admn. Block, NSIT, Sector-3, Dwarka, New Delhi-110078 by <str<strong>on</strong>g>the</str<strong>on</strong>g> Executive Engineer (C)/IIIT-D.Name of <str<strong>on</strong>g>work</str<strong>on</strong>g>: Provisi<strong>on</strong> of Evaporative Cooling System in <strong>on</strong>e class and lab at IIITD transit campus<str<strong>on</strong>g>for</str<strong>on</strong>g> trial of <str<strong>on</strong>g>the</str<strong>on</strong>g> higher efficiency cooling system at <str<strong>on</strong>g>the</str<strong>on</strong>g> present campus.Estimated Cost: Rs. 2,34,416.00TERMS & CONDITIONS:-1 The <str<strong>on</strong>g>work</str<strong>on</strong>g> shall be carried out as CPWD Specificati<strong>on</strong>s <str<strong>on</strong>g>for</str<strong>on</strong>g> Electrical Work (Internal/External - `1994& 1995’).2 Any damage d<strong>on</strong>e to <str<strong>on</strong>g>the</str<strong>on</strong>g> equipment / building during executi<strong>on</strong> of <str<strong>on</strong>g>work</str<strong>on</strong>g> shall be <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> part ofc<strong>on</strong>tractor.3 No T & P shall be issued to <str<strong>on</strong>g>the</str<strong>on</strong>g> C<strong>on</strong>tractor.4 The C<strong>on</strong>tractor must possess valid DVAT Certificate.5 The C<strong>on</strong>tractor must possess valid TIN No.6 Time allowed: 15 Days.7 Schedule of Quantity: As per Annexure-‘A’.8 Clause-12 of G.C.C. is applicable <str<strong>on</strong>g>for</str<strong>on</strong>g> E.I./S.I./Deviati<strong>on</strong> etc.9 EMD – Rs. 4,688.0010 Security Deposit @ 10% will be deducted from <str<strong>on</strong>g>the</str<strong>on</strong>g> bills of C<strong>on</strong>tractor.EXECUTIVE ENGINEER (C/M)/IIIT-D


PROJECT: IIIT Transit Campus (Third Floor, Library Building, NSIT, DWARKA)Annexure–ASUMMERY OF COST FOR HYBRID EVAPORATIVE COOLING WORKSS. No. Descripti<strong>on</strong> Unit Qty. Rate Amount1.0 Supply, Fabricated, installati<strong>on</strong> and commissi<strong>on</strong>ing of Hybrid Type Evaporative Each 1cooling system. Hybrid Cool Air System, built <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> twin c<strong>on</strong>cept of air compressi<strong>on</strong>and water vaporizati<strong>on</strong>, as per detailed Technical Specificati<strong>on</strong>s below:1. Double Effect Cooling System2. Air Discharge: 10600 CFM at 130 Pa3. Dust Protecti<strong>on</strong> inside cooled <str<strong>on</strong>g>are</str<strong>on</strong>g>a – through Positive Pressure of apx 12to 18 mm water.4. Power C<strong>on</strong>sumpti<strong>on</strong>: 1 KWH.5. Self Cleaning System <str<strong>on</strong>g>for</str<strong>on</strong>g> Membrances by PLC C<strong>on</strong>trol6. Size: 1 m X 1 m X 1 m.7. Apx Wt: 105 Kgs (max with water)8. Air Changes: 30 to 35 per hr.9. Area Cooled: apx 12000 to 15000 CFT10. Body: Stainless Steel in Steel grey colour11. Air inlet Mebrance: Maintenance free Polymer type membrance.12. Motor: Twin speed with rating of 1.0 Kw.13. Double alloy Axil flow.2.0 AIR DISTRIBUTION :2.1 Supply, Fabricati<strong>on</strong>, installati<strong>on</strong>, testing and commissi<strong>on</strong>ing of GSS sheet metalducting complete with hangers, supports and rubber gasket sealing as per <str<strong>on</strong>g>the</str<strong>on</strong>g>specificati<strong>on</strong> and approved drawing.24 gauge GSS ducting. Sq.M. 38.522.2 Supply and applicati<strong>on</strong> of 20 mm polystyrene <str<strong>on</strong>g>the</str<strong>on</strong>g>rmal insulati<strong>on</strong> of ducting as per Sq.M. 38.52<str<strong>on</strong>g>the</str<strong>on</strong>g> specificati<strong>on</strong>s and drawings.2.3 Supply, installati<strong>on</strong>, testing & commissi<strong>on</strong>ing of extruded aluminium c<strong>on</strong>structedsupply air grille without volume c<strong>on</strong>trol Damper.Sq.M. 0.72EXECUTIVE ENGINEER (C/M)/IIIT-D

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!