Expert Evident - Traffic<br />
7 Traffic Considerations<br />
7.1 Traffic Generation<br />
7.1.1 Residential<br />
In areas such as <strong>Northcote</strong>, while residents may choose to own and garage a vehicle, peak hour<br />
traffic generation is influenced by a number <strong>of</strong> locational factors such as:<br />
10 August 2012<br />
The proximity to public transport;<br />
The proximity to work places, shops and other facilities allowing residents to walk or cycle;<br />
and<br />
Existing levels <strong>of</strong> traffic congestion on the road network that can influence choice <strong>of</strong> transport<br />
mode at peak times.<br />
Surveys undertaken by my firm at two apartment developments at 350 Toorak Road and 15 Copelen<br />
Street, South Yarra in May 2009 recorded peak hour traffic generation rates <strong>of</strong> between 0.10 and 0.35<br />
vehicle movements per apartment, with an average <strong>of</strong> 0.28 vehicle movements per apartment per<br />
hour recorded.<br />
Both apartment developments included a range <strong>of</strong> apartment types and provide parking at least in<br />
accordance with the rates in the revised Clause 52.06 <strong>of</strong> the Planning Scheme.<br />
Conservatively adopting a generation rate <strong>of</strong> 0.40 movements per apartment and a daily rate <strong>of</strong> 4.0<br />
movements per apartment, the subject development will generate 364 vehicle movements per day,<br />
and 36 movements during each peak hour.<br />
During the morning peak, it is estimated that 80% <strong>of</strong> residential traffic will be outbound, while during<br />
the afternoon peak, 60% <strong>of</strong> residential traffic will be inbound.<br />
Based on the above, a total <strong>of</strong> 36 vehicle movements are expected to be generated to and from the<br />
subject site during each peak hour, as shown in Table 8.<br />
Table 8: Peak Hour Traffic Movements<br />
Time<br />
\\Melcfs01p\Apps\WINDOWS\2011\cg111755\Documents\CG111755<strong>VCAT</strong>001F01.docx<br />
Arrivals Departures Total<br />
AM Peak Hour 7 29 36<br />
PM Peak Hour 22 14 36<br />
7.2 Traffic Impact<br />
7.2.1 High Street/ <strong>Campbell</strong> <strong>Grove</strong>/ Bayview Street Intersection<br />
In consideration <strong>of</strong> the adjacent road network, it will be assumed that all traffic generated by the site<br />
will enter via the intersection <strong>of</strong> High Street and <strong>Campbell</strong> <strong>Grove</strong>.<br />
Given that motorists will have to choose an acceptable gap in the High Street traffic to depart<br />
<strong>Campbell</strong> <strong>Grove</strong>, it is my view that the critical period is during the morning peak hour. At this time, the<br />
development will generate an additional 29 departure movements to this intersection.<br />
Assuming that traffic is distributed to the intersection with a directional split <strong>of</strong> 80% south and 20%<br />
north, there will be 23 additional right turning vehicles and 6 left turning vehicles departing from<br />
<strong>Campbell</strong> <strong>Grove</strong> in the critical morning peak hour.<br />
It should also be noted that <strong>Campbell</strong> <strong>Grove</strong> has an existing departure volume <strong>of</strong> 1 movement in the<br />
morning peak hour. Therefore, it is expected that the proposed development will generate up to 29<br />
vehicles per hour to the <strong>Campbell</strong> <strong>Grove</strong>, resulting in a post development peak hour volume <strong>of</strong> up to<br />
Cardno Victoria Pty Ltd<br />
21<br />