10 T-Shirts11 Travel Vests12 CVE Manual100% cotton polo shirt,3 buttons, wood-tone,sizes: equal amounts <strong>of</strong>325-M, 325-L, 325-XXL;4-colorTravel Vest, 6 or morepockets, elastic andzipper closures,breathable mesh topand back. Cotton Nylonmix. Khaki colormaterial, with colorprinting. 100-Medium,125-Large, 125-XL, 100-XXLA4 size; 80 gram paper;double-sided printing;pages: 90 (sheets 45);cover: 120 gram glossypaper; binding: 3staples; pdf artwork tobe provided; color1,325 ea $0.00 $550 ea $0.00 $1,000 ea $0.00 $Subtotal $Taxes $Shipping Cost $Grand Total in US Dollars $RFQ/11/070Printing CVE <strong>Materials</strong><strong>IFES</strong> <strong>Liberia</strong>Page 8 <strong>of</strong> 117 Additional Terms & Conditions7.1 Non-Disclosure Agreement<strong>IFES</strong> reserves the right to require any <strong>of</strong>feror to enter into a non-disclosure agreement.7.2 CostsThe RFQ does not obligate <strong>IFES</strong> to pay <strong>for</strong> any costs, <strong>of</strong> any kind whatsoever, which may be incurredby <strong>of</strong>feror or any third parties, in connection with the Response. All Responses and supportingdocumentation shall become the property <strong>of</strong> <strong>IFES</strong>, subject to claims <strong>of</strong> confidentiality in respect <strong>of</strong>the Response and supporting documentation.7.3 Intellectual PropertyThe Respondent should not use any intellectual property <strong>of</strong> <strong>IFES</strong> including, but not limited to, alllogos, registered trademarks, or trade names <strong>of</strong> <strong>IFES</strong>, at any time without the prior written approval<strong>of</strong> <strong>IFES</strong>, as appropriate.
RFQ/11/070Printing CVE <strong>Materials</strong><strong>IFES</strong> <strong>Liberia</strong>Page 9 <strong>of</strong> 117.6 Partial Awarding<strong>IFES</strong> reserves the right to accept all or part <strong>of</strong> the quotation when awarding the purchase order.7.7 No Liability<strong>IFES</strong> reserve the right to accept or reject any quotation or stop the procurement process at anytime,without assigning any reason or liability.<strong>IFES</strong> shall not be liable to any <strong>of</strong>feror, person, or entity <strong>for</strong> any losses, expenses, costs, claims, ordamages <strong>of</strong> any kind:Arising out <strong>of</strong>, by reason <strong>of</strong>, or attributable to, the Respondent responding to this RFQ; orAs a result <strong>of</strong> the use <strong>of</strong> any in<strong>for</strong>mation, error, or omission contained in this RFQ documentor provided during the RFQ process.7.8 Entire RFQThis RFQ, any addenda to it, and any attached schedules, constitute the entire RFQ.