12.07.2015 Views

Basic Metal Deck - BlazeFrame

Basic Metal Deck - BlazeFrame

Basic Metal Deck - BlazeFrame

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Basic</strong> Submittal – Bare <strong>Deck</strong>Submittal Detail - Shaft Parallel Next to Coated Beam Z-Clip & DrywallUD26 - Shaft Wall Perpendicular Z-Clip and Drywall RipJoint Movement Capabilities (MC) / Profile Series refer to UL Listing: HW-D-0597 & 0504¾” MC - (Stock Series) 1” MC - ("W" Series)1 ½” MC - ("X" Series) 2” MC - ("Z" Series)Fastener Attachment 24" O/C max.Mineral WoolFastener Attachment intoZ-Clip Outrigger 16" O/C<strong>BlazeFrame</strong> CompositeTrack/Fire StopZ-Clip Outrigger(16" O/C)Installed Gap(See Notes)1" to 4"(See Notes)5/8" Type XGypsum Wallboard<strong>BlazeFrame</strong> CompositeAngle/Fire Stop"ISA" ProfileSteel StudMax 24" O/C1. Installed Gap (compression only) = movement capability (MC) of profile2. Installed Gap (compress + extension) = ½ movement capability (MC) of profile3. Attach to substrate with approved fastener max 24” O.C or per E.O.R.4. Do not screw drywall or stud to <strong>BlazeFrame</strong> solid leg profile studs "free float"5. “Slotted” profile metal framing fastener installed center of slot (finished side)6. Drywall fasteners 1” to 4" below <strong>BlazeFrame</strong> to accommodate MC or at bottom of obstructionUL, ASTM & Code StandardsLeed PointsUL2079 & ULC S115-M95MR 2.1 & 2.2 - Construction Waste: up to 2ptsASTM E814, E1966, E2837MR 4.1 & 4.2 - Recycled Content: up to 2 ptsA1003, A653, A924, C645, C754, C955 MR 5.1 & 5.2 - Regional ProximityAISI 2004 NASEQ 4.1 - Low Emitting Materials2009 IBC & 2010 CBC EQ 9 - Enhanced AcousticalPhone: (425) 869-2811 Fax: (425) 869-2300www.blazeframe.com 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!