Repairs to Covered Storage Building AS-4171 05110173SECTION 01 20 00PRICE AND PAYMENT PROCEDURES04/12PART 1GENERAL1.1 REFERENCESThe publications listed below form a part of this specification to theextent referenced. The publications are referred to in the text by thebasic designation only.U.S. ARMY CORPS OF ENGINEERS (USACE)COE EP-1110-1-8(1995) Construction Equipment Ownershipand Operating Expense Schedule1.2 SUBMITTALSSubmit the following in accordance with Section 01 33 00,"SubmittalProcedures."SD-01 Preconstruction SubmittalsSchedule of prices1.3 SCHEDULE OF PRICES1.3.1 Data RequiredWithin 15 calendar days of notice of award, prepare and deliver toContracting Officer a schedule of prices (construction contract) on theforms furnished by the Government. Provide a detailed breakdown of thecontract price, giving quantities for each of the various kinds of work,unit prices, and extended prices therefor. Schedule of prices shall beseparated by individual building numbers with subtotals for each building.1.3.2 Schedule InstructionsPayments will not be made until the schedule of prices has been submittedto and approved by the Contracting Officer. Identify the cost for sitework, and include incidental work to the 5 foot line. Identify costs forthe building(s), and include work out to the 5 foot line. Workout to the 5foot line shall include construction encompassed within a theoretical line5 feet from the face of exterior walls and shall include attendantconstruction, such as cooling towers, placed beyond the 5 foot line.1.4 CONTRACT MODIFICATIONSIn conjunction with the Contract Clause "DFARS 252.236-7000, ModificationProposals-Price Breakdown," and where actual ownership and operating costsof construction equipment cannot be determined from Contractor accountingrecords, equipment use rates shall be based upon the applicable provisionsof the COE EP-1110-1-8.SECTION 01 20 00 Page 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!