12.07.2015 Views

Specifications - Huryn Justice General Contractors

Specifications - Huryn Justice General Contractors

Specifications - Huryn Justice General Contractors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SUBMITTAL REGISTERCONTRACT NO.TITLE AND LOCATIONRepairs to Covered Storage Building AS-4171CONTRACTORACTIVITYNOTRANSMITTALNOSPECSECTDESCRIPTIONITEM SUBMITTEDPARAG #RAPHCLASSIFICATIONGOVTORA/EREVWRSUBMITCONTRACTOR:SCHEDULE DATESAPPROVALNEEDEDBYMATERIALNEEDEDBYCONTRACTORACTIONACTIONCODEDATEOFACTIONDATE FWDTO APPRAUTH/DATE RCDFROMCONTRDATE FWDTO OTHERREVIEWERAPPROVING AUTHORITYDATE RCDFROM OTHREVIEWERACTIONCODEDATEOFACTIONMAILEDTOCONTR/DATE RCDFRM APPRAUTHREMARKS(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)09 65 00 Resilient Flooring andAccessoriesSD-03 Product DataResilient Flooring andAccessoriesAdhesives2.72.72.3Vinyl Composition TileSD-04 SamplesResilient Flooring andAccessoriesSD-06 Test ReportsMoisture, Alkalinity and BondTestsSD-08 Manufacturer’s InstructionsSurface Preparation2.12.73.33.2InstallationSD-10 Operation and MaintenanceDataResilient Flooring andAccessoriesSD-11 Closeout SubmittalsResilient Flooring andAccessoriesAdhesives3.12.72.72.309 90 00.00 40 SD-03 Product DataInhibitive Metal Primer2.1SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 15 PAGES

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!