12.07.2015 Views

Specifications - Huryn Justice General Contractors

Specifications - Huryn Justice General Contractors

Specifications - Huryn Justice General Contractors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Repairs to Covered Storage Building AS-4171 05110173portions of assemblies which are to be incorporated into the project andthose which will be removed at conclusion of the work.SD-05 Design DataCalculations, mix designs, analyses or other data pertaining to a part ofwork.SD-06 Test ReportsReport signed by authorized official of testing laboratory that a material,product or system identical to the material, product or system to beprovided has been tested in accord with specified requirements. (Testingmust have been within three years of date of contract award for theproject.)Report which includes findings of a test required to be performed by thecontractor on an actual portion of the work or prototype prepared for theproject before shipment to job site.Report which includes finding of a test made at the job site or on sampletaken from the job site, on portion of work during or after installation.Investigation reportsDaily checklistsFinal acceptance test and operational test procedureSD-07 CertificatesStatements signed by responsible officials of manufacturer of product,system or material attesting that product, system or material meetsspecification requirements. Must be dated after award of project contractand clearly name the project.Document required of Contractor, or of a supplier, installer orsubcontractor through Contractor, the purpose of which is to furtherquality of orderly progression of a portion of the work by documentingprocedures, acceptability of methods or personnel qualifications.Confined space entry permits.SD-08 Manufacturer's InstructionsPreprinted material describing installation of a product, system ormaterial, including special notices and Material Safety Data sheetsconcerning impedances, hazards and safety precautions.SD-09 Manufacturer's Field ReportsDocumentation of the testing and verification actions taken bymanufacturer's representative to confirm compliance with manufacturer'sstandards or instructions.Factory test reports.SD-10 Operation and Maintenance DataSECTION 01 33 00 Page 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!