12.07.2015 Views

PROJECT: 2 x 660MW Coal Handling Plant Package for Meja ...

PROJECT: 2 x 660MW Coal Handling Plant Package for Meja ...

PROJECT: 2 x 660MW Coal Handling Plant Package for Meja ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SLNoISG BANGALOREClause9.0 GuaranteePeriod<strong>PROJECT</strong>:2 x <strong>660MW</strong> <strong>Coal</strong> <strong>Handling</strong> <strong>Plant</strong> <strong>Package</strong> <strong>for</strong> <strong>Meja</strong>Thermal Power Project, <strong>Meja</strong>, Dist: Allahabad, UP.BHEL RequirementNote: Sub-contractor shall strictly adhere to ‘L2’ schedule :In case of non compliance to agreed schedules / milestones,then it would be presumed that vendor / contractor is notfulfilling contractual obligations. BHEL reserves the right totake suitable action like operating “Risk & cost clause”.In case the work gets delayed and scheduled completiongets extended due to reasons not attributable to thecontractor, time extension will be granted by BHEL withoutany price implication.12 Months from the date of completion of Civil & Structuralworks under scope, as certified by BHEL Engineer.CommercialTerms &ConditionsBidder’sAcceptance /Remarks10.0 Insurance a) By the bidder <strong>for</strong> his workers, tools & tackles, workmencompensation insurance. Bidders shall also take thirdparty insurance liability @ Rs. 2 Lakhs per occurrenceand maximum of Rs.10 Lakhs.b) In the event of loss, damage or theft of the materialfrom the storage area or from the erected equipment,the bidder shall make good of the same within areasonable time. The actual cost towards such worksshall be reimbursed by BHEL to the contractor. However,all required documents are to be furnished by thecontractor to BHEL <strong>for</strong> lodging a claim on insurancecompany and also the contractor shall extend necessaryhelp in realizing the claim.11.0 Validity of theoffer90 Days from the date of the opening of the tender.In case revised price bids are sought due to revision in BOM/ scope during technical evaluation, then the revised pricebids shall also be valid <strong>for</strong> another 90 days from the reviseddue date.12.0 Risk and Cost As per the risk & cost policy, if bidder fails to render theservices, tools and tackles or failed to carry out the job intime specified under their scope, BHEL will get the job doneat the risk & cost of the bidder. The actual cost incurred <strong>for</strong>such jobs along with the departmental charges @ 15% willbe recovered from the contractor bills.13.0 Arbitration Subject to Bangalore jurisdiction only based on IndianArbitration Act 1996 and latest amendments if any.Enquiry No: REV. R0 PAGE 5 of 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!