12.07.2015 Views

PROJECT: 2 x 660MW Coal Handling Plant Package for Meja ...

PROJECT: 2 x 660MW Coal Handling Plant Package for Meja ...

PROJECT: 2 x 660MW Coal Handling Plant Package for Meja ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SLNoISG BANGALOREClause30.0 ReverseAuction31.0 Rejection ofoffer32.0 QuantityVariation<strong>PROJECT</strong>:2 x <strong>660MW</strong> <strong>Coal</strong> <strong>Handling</strong> <strong>Plant</strong> <strong>Package</strong> <strong>for</strong> <strong>Meja</strong>Thermal Power Project, <strong>Meja</strong>, Dist: Allahabad, UP.BHEL RequirementShri J. M. Lyngdoh , IAS (Retd.)Plot No. 144-145,Pragati Resort, Proddator Village & P.O.,Shankarpally Road,Rangareddy Distt. (AP)- 500 033All correspondence with Shri J M Lyngdoh, IAS (Retd) has tobe with registered post only as courier service isnot available.BHEL reserves the right to go <strong>for</strong> Reverse Auction instead ofopening the submitted sealed bid, which will be decidedafter technical evaluation. In case the reverse auction couldnot be conducted due to any reasons or a need arises dueto any other reason, BHEL reserves the right to open thesealed price bids in public and finalize the order accordingly.Non acceptance of this clause by the bidder will lead torejection of offer.BHEL reserves the right to reject the offer, in case thebidders past per<strong>for</strong>mance in any of the BHEL’s previouscontract’ is not found satisfactory.The quoted rate of each item shall be valid <strong>for</strong> item wisevariation in quantity which may vary to any extent and also<strong>for</strong> the total variation in value of work up to plus or minus30% of the total contract value.In case the actual value of executed work on completion ofcontract becomes less than 70% of the contract value, thenactual value shall be raised by 7% of the executed value,subject to the condition that the total value of workexecuted plus increase by 7% as above shall be limited to70% of the contract value.CommercialTerms &ConditionsBidder’sAcceptance /Remarks33.0 All otherTerms &Conditions34.0 Registrationof New Sub-Contractors inBHEL-ISG.( applicable<strong>for</strong> non PMDAs per BHEL Tender enquiry.Bidders required to get registered in BHEL-ISG ProductMaterial Directory (PMD) i.e., Contractor Registrationwithout which BHEL-ISG will not be able to process theoffer.Enquiry No: REV. R0 PAGE 8 of 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!