Ir. Allan WH Wong - Division of Building Science and Technology
Ir. Allan WH Wong - Division of Building Science and Technology
Ir. Allan WH Wong - Division of Building Science and Technology
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
LOK MA CHAU SPUR LINE●●Plans for the Lok Ma Chau Spur Line were endorsed bythe Government <strong>of</strong> the Hong Kong SpecialAdministrative Region in 2002. Urgently needed as asecond crossing to relieve passenger congestion at the LoWu boundary with the Mainl<strong>and</strong>, the Spur Line will runalong a combined tunnel <strong>and</strong> viaduct alignment. Thetotal length <strong>of</strong> the railway will be 7.4km, <strong>of</strong> which 4.3kmwill be in tunnels <strong>and</strong> 3.1km on viaduct.The tunnels will run from north <strong>of</strong> Sheung Shui Stationto Chau Tau. From Chau Tau the alignment will risegradually onto a viaduct to terminate at the Lok Ma ChauStation.