Penny Bay Disney site formation●(vi) A sewerage network to convey sewage to the existing sewagetreatment plant at Siu Ho Wan;(vii) A stormwater drainage system including open channels <strong>and</strong>box <strong>and</strong> pipe culverts in the reclamation;(viii) Fresh water supply from a service reservoir at Yam O Tuk,<strong>and</strong> salt water supply from Tai Ho. The total length <strong>of</strong> watermainis about 8 km;(ix) Essential GIC facilities including two police posts <strong>and</strong> onefire/ambulance station;(x) Associated L<strong>and</strong>scaping works; <strong>and</strong>●●(xi) Associated environmental monitoring <strong>and</strong> audit worksEstimated Project Cost:13.6 billionCurrent Project Progress: Overall progress <strong>of</strong> reclamation <strong>and</strong>infrastructure works for Phase I Penny's Bay Development is 93%