12.07.2015 Views

7.2 Prefabricated Construction Systems adopted in Hong Kong

7.2 Prefabricated Construction Systems adopted in Hong Kong

7.2 Prefabricated Construction Systems adopted in Hong Kong

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Project example – Road T7 <strong>in</strong> Ma On Shan (TTD project)Technical Features1. Total length of viaduct – 2200m (approx.)2. Span length – Average 40m3. Total nos. of segment used – 790 nos.4. No. of segment per span – average 14 nos.5. Weight of segment – rang<strong>in</strong>g from 50 to 98 tons6. Weight of the launch<strong>in</strong>g mach<strong>in</strong>e – 310 tons7. Max. weight of mach<strong>in</strong>e with segments – 1300 tons8. Length of launch<strong>in</strong>g mach<strong>in</strong>e – 85m9. Cast<strong>in</strong>g of the box-girder segment – match-cast

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!