12.07.2015 Views

7.2 Prefabricated Construction Systems adopted in Hong Kong

7.2 Prefabricated Construction Systems adopted in Hong Kong

7.2 Prefabricated Construction Systems adopted in Hong Kong

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Practical Constra<strong>in</strong>ts1. Tighter coord<strong>in</strong>ation to allow for structural design,construction plann<strong>in</strong>g, procurement & approvalprocedure2. Required a critical amount of precast items before workcan be economically used3. Huge work space for handl<strong>in</strong>g precast elementsespecially <strong>in</strong> congested urban environment <strong>in</strong> <strong>Hong</strong><strong>Kong</strong>4. Congested site environment makes access anddelivery of heavy precast units to the work spotbecomes difficult5. Quality assurance become critical especially wherelarge amount of precast components are used asstructural nature

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!