12.07.2015 Views

7.2 Prefabricated Construction Systems adopted in Hong Kong

7.2 Prefabricated Construction Systems adopted in Hong Kong

7.2 Prefabricated Construction Systems adopted in Hong Kong

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

d) SStorage and pre-<strong>in</strong>stallation handl<strong>in</strong>g, aga<strong>in</strong>, requires extrawork<strong>in</strong>g space.e) IInstallation of precast elements on site requires carefulplann<strong>in</strong>g and extra cranage provisions.f) HHandl<strong>in</strong>g and assembly of heavy precast members, posescerta<strong>in</strong> safety problems and <strong>in</strong>crease risk both to humanoperatives or to the semi-completed structure itself.g) TThe structure under assembly <strong>in</strong> its semi-completed statemay cause difficulties <strong>in</strong> mak<strong>in</strong>g access <strong>in</strong>to the work spot.h) DDefective connections may result to cracks and waterleakage which will create further ma<strong>in</strong>tenance problems.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!