- Page 1: Environmental Project No. 809 2003M
- Page 6: PrefaceThe project on “Developmen
- Page 9 and 10: Model B can be carried out initiall
- Page 11 and 12: Both presentation methods (referred
- Page 13 and 14: The significance of the potential s
- Page 16 and 17: 2 From waste quantities toenvironme
- Page 18 and 19: a number of materials in the so-cal
- Page 20 and 21: 2.2.1 Environment and resource indi
- Page 22 and 23: that if any material is removed fro
- Page 24 and 25: 2.3.4 Which indicators are relevant
- Page 26 and 27: 3 Screening of environment andresou
- Page 28 and 29: Table 3.1 Differences in environmen
- Page 30 and 31: 4 Calculation method andassumptions
- Page 32 and 33: Calculations are based on data from
- Page 34 and 35: Table 4.3 Calculated factors (norma
- Page 36 and 37: have taken place in the area. Calcu
- Page 38 and 39: 5 Results of calculationsThe calcul
- Page 40 and 41: Total resource consumption associat
- Page 42 and 43: Figure 5.4Total primary energy cons
- Page 44 and 45: Figure 5.7Total landfill requiremen
- Page 46 and 47: Figure 5.10Consumption of resources
- Page 48 and 49: 5.4 Indicators with focus on saving
- Page 50 and 51: In relation to current recycling th
- Page 52 and 53:
Figure 5.14Realised savings from cu
- Page 54:
Figure 5.18Realised resource saving
- Page 57 and 58:
need updating before being applicab
- Page 59 and 60:
Table 6.1Total time required for st
- Page 61 and 62:
One of the points is that focus is
- Page 63 and 64:
Model B will be suitable for meetin
- Page 65 and 66:
perspective cf. statistics /36/. Th
- Page 68 and 69:
9 ReferencesThe list of references
- Page 70:
(31) Sewage sludge from municipal a
- Page 73 and 74:
Appendix A1.12.2 Environment and re
- Page 75 and 76:
Appendix A1 Waste fractions and env
- Page 77 and 78:
Appendix AFor recycling, the ISAG s
- Page 79 and 80:
tion*) All resource consumption and
- Page 81 and 82:
Appendix AEnergy-derived environmen
- Page 83 and 84:
Appendix ABoth upon incineration an
- Page 85 and 86:
Appendix ArecoveryLandfillingDecomp
- Page 87 and 88:
Appendix A1.6.2 Environment and res
- Page 89 and 90:
Appendix ATable 1.17: Significant e
- Page 91 and 92:
Appendix ARecycling of rubber as a
- Page 93 and 94:
Appendix A1.9.3 Data basisTable 1.2
- Page 95 and 96:
Appendix AIn so-called selective de
- Page 97 and 98:
Appendix Anecessary there is a long
- Page 99 and 100:
Appendix A1.14 Other recyclables1.1
- Page 101 and 102:
Appendix ATable 1.41: Significant e
- Page 103 and 104:
Appendix A”Domestic waste from pr
- Page 105 and 106:
Appendix AUpon incineration of slud
- Page 107 and 108:
Appendix A1.20.2 Environment and re
- Page 109 and 110:
Appendix ATable 1.60: Significant e
- Page 111 and 112:
Appendix A1.23 Electrical equipment
- Page 114 and 115:
Appendix BTime consumption forcompr
- Page 116 and 117:
Appendix B2.1 Review of material fr
- Page 118 and 119:
• Iron and steel (excl. stainless
- Page 120 and 121:
Appendix Bthat statistics cover qua
- Page 122 and 123:
Appendix BIt is estimated that ther
- Page 124 and 125:
Appendix BTable 2.1:Data sources fo
- Page 126 and 127:
Appendix CAssumptions for calculati
- Page 128 and 129:
Appendix CSo the only possibility l
- Page 130 and 131:
Appendix CThe EDIP project uses a l
- Page 132 and 133:
Appendix CThis method will often un
- Page 134 and 135:
Appendix C2) In the EDIP database t
- Page 136 and 137:
Appendix Chas supplied in connectio
- Page 138 and 139:
Appendix C1998, which has been used
- Page 140:
Appendix CThus, slag is primarily r