12.07.2015 Views

CWRB Briefing Slides - U.S. Army Corps of Engineers

CWRB Briefing Slides - U.S. Army Corps of Engineers

CWRB Briefing Slides - U.S. Army Corps of Engineers

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

US <strong>Army</strong> <strong>Corps</strong><strong>of</strong> <strong>Engineers</strong> ®Alternative PlansEvaluated:• No Action• Non-Structural, Relocate flood plain structures• Structural– Pump Stations– Tunnel construction– Channel Reconstruction with Road and Railroad CrossingsEffective Plan Selected to be Optimized:• Channel Reconstruction with Road andRailroad CrossingsOne <strong>Corps</strong> Serving the Armed Forces and the Nation

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!