CWRB Briefing Slides - U.S. Army Corps of Engineers
CWRB Briefing Slides - U.S. Army Corps of Engineers
CWRB Briefing Slides - U.S. Army Corps of Engineers
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
US <strong>Army</strong> <strong>Corps</strong><strong>of</strong> <strong>Engineers</strong> ®LPP COSTS AND BENEFITSInvestment Costs: Project Construction Costs $24,813,100(3.8-year construction period) Interest During Construction 2,456,000(50-year period <strong>of</strong> analysis) Total Investment Cost $27,269,100Average Annual Costs: Interest & Amortization $1,522,600OMRR&R 65,200Total Average Annual Costs $1,587,800Aver. Ann. NED Benefits: Flood Damage $1,366,800Emergency, Nonphys & Utility 269,400Auto, Flood Insurance & Repair 87,100Total Average Annual Benefits $1,723,300Net Annual Benefits: $135,500Benefit/Cost Ratio: .82 @ 7% per EO 12893 1.09 @ 5.125%One <strong>Corps</strong> Serving the Armed Forces and the Nation