12.07.2015 Views

CWRB Briefing Slides - U.S. Army Corps of Engineers

CWRB Briefing Slides - U.S. Army Corps of Engineers

CWRB Briefing Slides - U.S. Army Corps of Engineers

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

US <strong>Army</strong> <strong>Corps</strong><strong>of</strong> <strong>Engineers</strong> ®LPP COSTS AND BENEFITSInvestment Costs: Project Construction Costs $24,813,100(3.8-year construction period) Interest During Construction 2,456,000(50-year period <strong>of</strong> analysis) Total Investment Cost $27,269,100Average Annual Costs: Interest & Amortization $1,522,600OMRR&R 65,200Total Average Annual Costs $1,587,800Aver. Ann. NED Benefits: Flood Damage $1,366,800Emergency, Nonphys & Utility 269,400Auto, Flood Insurance & Repair 87,100Total Average Annual Benefits $1,723,300Net Annual Benefits: $135,500Benefit/Cost Ratio: .82 @ 7% per EO 12893 1.09 @ 5.125%One <strong>Corps</strong> Serving the Armed Forces and the Nation

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!