US <strong>Army</strong> <strong>Corps</strong><strong>of</strong> <strong>Engineers</strong> ®COST SHARINGReaches 1 - 4 Federal NonFederal TotalLands and Damages $ 144,700 $3,296,700 $3,441,400Relocations - 4,943,600 4,943,600Channel & Control Structure 13,136,000 - 13,136,000Engineering and Design 1,484,200 558,500 2,042,700Construction Management 1,336,300 503,000 1,839,3005% Cash Contribution (1,270,200) 1,270,200 -Total Cost, Reaches 1-4 $14,831,000 $10,572,000 $25,403,000Total Cost, Reaches 5-6 - 5,082,000 5,082,000Total Cost, Reaches 1-6 $14,831,000 $15,654,000 $30,485,000Percent <strong>of</strong> Cost, Reaches 1-6 49% 51% 100%One <strong>Corps</strong> Serving the Armed Forces and the Nation