12.07.2015 Views

Pressure Piping Construction Requirements QMS MANUAL ... - ABSA

Pressure Piping Construction Requirements QMS MANUAL ... - ABSA

Pressure Piping Construction Requirements QMS MANUAL ... - ABSA

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Pressure</strong> <strong>Piping</strong> <strong>Construction</strong> <strong>Requirements</strong><strong>QMS</strong> <strong>MANUAL</strong> & AUDIT CHECKLIST AB-518(b)Electronic completion of this document is preferredWhen spool drawings or cut sheets are prepared by the manufacturer,are the drawings or cut sheets controlled and referenced by the ownersuppliedconstruction or design drawings?N/A ; Yes ; NoAB-518b 2014-01Are the drawings reviewed and approved by the manufacturer prior torelease for construction?Yes; NoReviewer s Comments:3.3.9Purchasing and Material ControlPurchasing: Has the manufacturer:specified purchasing responsibilities?Is purchasing being done byqualified personnel?Yes ; Nospecified the process for the purchasing of materials and forensuring conformance to the material requirements of theengineering design and requirements of the owner?Are the materials properlyspecified in the P.O. and meetthe requirements of theengineering design?Yes ; Noensured that the fittings ordered are registered with <strong>ABSA</strong> (havevalid CRN for installation in Alberta)?Is documentation confirmingCRN available?Yes ; Nospecified the process for controlling purchase documents?Are the specified controls inpractice?Yes ; NoPage 13 of 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!