12.07.2015 Views

Pressure Piping Construction Requirements QMS MANUAL ... - ABSA

Pressure Piping Construction Requirements QMS MANUAL ... - ABSA

Pressure Piping Construction Requirements QMS MANUAL ... - ABSA

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Reviewer s Comments:<strong>Pressure</strong> <strong>Piping</strong> <strong>Construction</strong> <strong>Requirements</strong><strong>QMS</strong> <strong>MANUAL</strong> & AUDIT CHECKLIST AB-518(b)Electronic completion of this document is preferredAB-518b 2014-013.3.13Examination(Examination and inspections activities performed by the manufacturer)Are the responsibilities for the examination activities and qualificationsof an examiner defined?Yes; NoAre the examinations specified for various stages of constructionconducted?Yes; NoAre <strong>QMS</strong> examination requirements and associated proceduresavailable and understood by the personnel responsible for theexamination activities?Confirm availability ofdocuments at the point of useand verify understandingthrough personnel interviews.Yes ; NoAre the materials received from the owner(s) and supplier(s) examinedto assure conformance with the requirements of the engineeringdesign?Are the partial piping systems and documents received from thesubcontractors examined prior to release for further processing?Are the partial piping turnover packages received from manufacturerswithin Alberta accompanied by Partial AB-83 forms?YesYesYes; No; No; NoAre the piping systems and documentation received from manufacturersoutside of Alberta accompanied by AB-83F forms and examined priorto release?Yes; NoPage 19 of 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!