Pressure Piping Construction Requirements QMS MANUAL ... - ABSA
Pressure Piping Construction Requirements QMS MANUAL ... - ABSA
Pressure Piping Construction Requirements QMS MANUAL ... - ABSA
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
3.3.11Post Weld Heat Treatment (PWHT)<strong>Pressure</strong> <strong>Piping</strong> <strong>Construction</strong> <strong>Requirements</strong><strong>QMS</strong> <strong>MANUAL</strong> & AUDIT CHECKLIST AB-518(b)Electronic completion of this document is preferredAB-518b 2014-01Has the manufacturer:assigned responsibilities for the implementation and maintenance of thePWHT procedures?Yes; Noverified that the PWHT requirements are defined in the engineeringdesign/drawings or otherwise made available by the owner?Yes; Noensured that the PWHT activities are executed in accordance with therequirements of the engineering design?Yes; Noensured that the piping spools designated for PWHT are identified? Yes ; Noensured that the PWHT instructions for the piping are prepared andsupplied to the heat treatment contractor?Yes; Noensured that upon completion of the PWHT of the piping, it is inspectedand the documentation verified?Yes; Nomaintained PWHT documentation? Yes ; NoReviewer s Comments:Page 17 of 25