12.07.2015 Views

Pressure Piping Construction Requirements QMS MANUAL ... - ABSA

Pressure Piping Construction Requirements QMS MANUAL ... - ABSA

Pressure Piping Construction Requirements QMS MANUAL ... - ABSA

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Is the procedure effective and meets the requirements of theengineering design and the code of construction?<strong>Pressure</strong> <strong>Piping</strong> <strong>Construction</strong> <strong>Requirements</strong><strong>QMS</strong> <strong>MANUAL</strong> & AUDIT CHECKLIST AB-518(b)Electronic completion of this document is preferredYes; NoAB-518b 2014-01Is the procedure being complied with? Yes ; NoAre the pressure gauges calibrated and of proper range? Yes ; NoAre the required examinations carried out by qualified personnel? Yes ; NoAre the pressure test records maintained? Yes ; Nofor ASME B31.1 Boiler External <strong>Piping</strong>, are prior arrangements madewith <strong>ABSA</strong> to enable a SCO to inspect and witness the pressure test?Yes; NoReviewer s Comments:3.3.15Control of Monitoring and Measuring DevicesHas the manufacturer ensured that:a process is developed for determining which measurements arerequired to be taken during the construction, examination and testing ofpressure piping and for selecting the appropriate equipment that iscapable of providing the necessary accuracy and precision?Yes; Noinspection, measuring and test equipment is identified, calibrated andadjusted at prescribed intervals, and that the equipment is verified to bein good condition prior to use?Sample the equipment.Yes ; NoPage 21 of 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!