12.07.2015 Views

PE Pipe Technical Catalogue (PDF) - Pipelife Norge AS

PE Pipe Technical Catalogue (PDF) - Pipelife Norge AS

PE Pipe Technical Catalogue (PDF) - Pipelife Norge AS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Pipe</strong>life <strong>Norge</strong> <strong>AS</strong><strong>PE</strong> CATALOGUE-SUBMARINE APPLICATIONS, PI<strong>PE</strong>LIFE NORGE <strong>AS</strong>, December 2002.A.5 Design of parameters for the sinking processThe critical phase for installations of a <strong>PE</strong>-pipe is the sinking.Fig. A.5.1 below shows the situation during sinking of a <strong>PE</strong>-pipeline.VPa a·HH(1-a a )·HFig. A.5.1 <strong>PE</strong>-pipeline during sinkingTo carry out a safe installation we should consider the balance between the forces acting downward(q 1 )and the forces acting upwards (q 2 ). The downward forces are created mainly by the concreteweights on the pipeline and the upward forces are due to buoyancy of the air filled section.To start and to continue the sinking process, the downward forces must be a little greater thanthe upward forces.To control this difference is essential and the main challenge during sinking.We must try to avoid acceleration forces on the system. This can be controlled by recordingthe sinking speed (v) and regulating the internal pressure (p).If the speed is increasing, we can increase the air pressure and vice versa.For regulation of the air pressure we apply valves and compressor.The most critical situation for the pipeline regarding damage, is buckling at the sea surface or atthe bottom due to "exceeded" buckling radius, ref. A.3.5.1.To secure a sufficient radius it is necessary to apply a pulling force (P) in the end of the pipe.With reference to fig. A.5.1, we have the following parameters available for control and regulationsduring sinking :- Air pressure (p)- Pulling force (P)- Sinking velocity (v)In the next chapters we shall give some recommendations for calculation of these parameters.If we can carry out a slowly sinking, the installation will be successful from the pipeline's pointof view.Side 66 av 84

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!