12.07.2015 Views

PE Pipe Technical Catalogue (PDF) - Pipelife Norge AS

PE Pipe Technical Catalogue (PDF) - Pipelife Norge AS

PE Pipe Technical Catalogue (PDF) - Pipelife Norge AS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Pipe</strong>life <strong>Norge</strong> <strong>AS</strong><strong>PE</strong> CATALOGUE-SUBMARINE APPLICATIONS, PI<strong>PE</strong>LIFE NORGE <strong>AS</strong>, December 2002.F 1Fig. B.3.5 Installation of a transit pipeline in principalFig. B.3.6 Installation of an intake or an outfall pipeline in principal.<strong>Pipe</strong>line systems are sunk in the direction from shore to the outer end, or other side of water.Normally the whole pipe is sunk in one operation. If the ambient conditions are adverse and varyfrom calm to rough sea, the pipe could be installed in sections, step-by-step. For practical reasons itcan also be convenient to install the pipe in sections.After one section is sunk, its sealed flange end rests on the sea bed. In a period with calm weather,the pipe is filled with air to lift its end to the surface, and the sinking proceeds, as soon as the nextsection in connected to the flange. During connection there must be applied a pulling force to avoidbuckling.There are also other methods to connect pipe sections in a step-by-step sinking. Dependent on thecontractor’s resources over and below sea-level, the connection can take place at seabed, semideepor in surface position.Short pipe pieces may be needed for connection between section ends on seabed dependent on thesinking method. Divers install those pieces after the sinking has taken place and the lengths arebased on exact surveying.During the sinking of pipe, water can be filled in one of the following ways :1. Blind flange with a valve located onshore, and water deliveredby a pump or from a water main.2. Blind flange with a valve located offshore, at a depth of 2 to 5 meters,with water filled directly by opening the valve3. Blind flange with valve in the inlet/outlet chamber,pipe connected to separate flange in chamber wall.Side 82 av 84

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!