12.07.2015 Views

December 2011 - SIMA

December 2011 - SIMA

December 2011 - SIMA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The first of these plants in India has already beencontracted by JSPL – a 2.5 million tpy Energiron ZRfacility that will use coal gasification as the reducinggas source. Actually, it is the first of four plants agreedon with JSPL for a total of 10 million tons per year ofhigh quality DRI and should be operational by 2014.In large facilities such as the ones being developedby JSPL and others, the coal gasification plants canhave a dual purpose by producing both syngas forthe DR plant as well as power for related facilities.Syngas Micro-Module?The characteristics of the ZR process make the Micro-Module and the large 2.5 million tpy Energiron plantssimilar in every respect except size. Therefore, theMicro-Module could conceivably also use syngasinstead of natural gas – technically there is no difficultyin doing so. However, the capital cost of installing acoal gasification plant is quite high and, in the caseof a Micro-Module plant, would be more expensivethan the DR plant itself. The current state of affairsmakes this an unlikely combination and in fact forDR plants under 1 million tons of annual capacity,the use of a coal gasification plant cannot be easilyjustified. Future developments could change thissituation, but for the present, syngas is an option onlyfor larger scale production units.Recent ProjectsSince 2005, Tenova HYL has started up or is buildingand/or upgrading a significant number of new DRIplants worldwide. The following tables show the latestplants and upgrades.New Projects since end of 2005Plant Country Modules Technology Product Capacity Product Quality(Million ton/yr) Metallization Start UpDesign (Carbon)(a) WelspunMaxsteel Ltd. India 1 ENERGIRON ZR DRI 0.60 94.0 (3.0) 2006 / 2009Emirates Steel 1(GHC) Abu Dhabi 1 ENERGIRON III HYTEMP/DRI 1.60 94.0 (2.0) 2009Gulf Sponge Iron(Al Nasser) UAE 1 HYL-ZR DRI 0.20 93.0 (3.5) 2010Sidor Venezuela 1 HYL III DRI 0.80 94.0 (2.5) <strong>2011</strong>Ezz Rolling Mills Egypt 1 ENERGIRON III DRI 1.90 94.0 (2.0) <strong>2011</strong>Emirates Steel 2(GHC) Abu Dhabi 1 ENERGIRON III HYTEMP/DRI 1.60 94.0 (2.0) <strong>2011</strong>Suez Steel Egypt 1 ENERGIRON ZR HYTEMP/DRI 1.95 94.0 (3.5) 2012Nucor Louisiana USA 1 ENERGIRON ZR DRI 2.50 96.0 (3.5) 2013(b) Jindal Steel& Power India 4 ENERGIRON ZR HYTEMP/DRI 2.50 94.0 (2.5) ContractedNotes:a) 100% lump ore feedb) Syngas based plantsDECEMBER-<strong>2011</strong>/29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!