13.07.2015 Views

SITC OF LT Switch gear for Doordarshan, HPT Vizag - All India Radio

SITC OF LT Switch gear for Doordarshan, HPT Vizag - All India Radio

SITC OF LT Switch gear for Doordarshan, HPT Vizag - All India Radio

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(b) TECHNICAL BID: Technical bid should contain the confirmation to theenclosed technical specifications. This should be submitted in a separate sealedenvelope with “TECHNICAL BID” written on it.(c) COMMERCIAL BID:The commercial bid should contain the price bid andacceptance of the commercial terms and conditions of this tender document.The price should be quoted <strong>for</strong> free delivery of materials at respectivedestinations. This should be submitted in a separate sealed envelope with “Thetenders will be submitted in sealed envelopes with the name of work, date ofopening and the bid enclosed written on the envelopes.The above mentioned envelopes should be enclosed and submitted in anotherlarge size envelope duly sealed and superscribed with <strong>SITC</strong> <strong>OF</strong> <strong>LT</strong> <strong>Switch</strong> <strong>gear</strong><strong>for</strong> <strong>Doordarshan</strong>, <strong>HPT</strong>, Visakapatnam. “and date of opening. Theenvelope will be received at this office of The ADG(E) (SZ), AIR & TV, Swamy SivanandaSalai, Chennai-5 up to 1230 hrs. on 26.06.2012 . The technical bid and E.M.D. will beopened on the same day at 1500 hrs. The commercial bid will be notified afterrecommendation of technical committee.In case tender opening date falls on a holiday, the bids will be received andopened at the same specified time on next working day. Bids received late orsubmitted after the scheduled specified time on scheduled date will not beentertained and will be returned back unopened.The purchaser may, at his discretion extent the deadline <strong>for</strong> the submission ofthe bids by amending the bid document, in which case all rights andobligations of the purchaser and bidders previously subject to then deadline willthereafter be subject to the deadline as extended.Tenderer should quote <strong>for</strong> all the required items. Partial tenders will berejected.(d) SECURITY DEPOSIT: the successful Tenderer shall furnish the SecurityDeposit within 2 weeks after placement of order at the rate of 5% of the OrderValue, failing which the EMD will be <strong>for</strong>feited automatically, to Presidentof <strong>India</strong>, without any notice. The security deposit shall be furnished in the<strong>for</strong>m of Demand Draft / Bank Guarantee drawn in favour of The ADG (E) (SZ),AIR & DD, Chennai-5. The Security Deposit will be returned in full oncompletion of successful Guarantee/Warranty Period.5. TAXES:a. Payment o f Entry Ta x / O ctroi D ut y and Toll T ax (on ultimateproducts). As the material, which is to be transported to the consignee,belongs to the Government of <strong>India</strong> / Prasar Bharati and there<strong>for</strong>e isexempted from Entry Tax / Octroi Duty / T oll Tax. However, if the StateGovernments / Statutory Local Bodies are bound to levy such taxes, thetaxes will be paid by supplier / contractor. Supplier / Contractor may raiseits claim, <strong>for</strong> reimbursement of such duties / taxes paid, withOrganisation, along with original receipt of the payment.b. Sales Tax / Service Tax leviable and intended to be claimed from the purchasershould be distinctly shown along with prices quoted. Where this is not done noclaim <strong>for</strong> Sales Tax / Service Tax will be admitted at any later stage and on anyground whatsoever.* Please note that this Office will not issue any Form such as ‘C’, ‘D’ etc.6. Printed terms and conditions of tendering firms will not be considered as<strong>for</strong>ming parts of their tender.7. GUARANTEE / WARRANTY PERIOD: The Equipment / Work shall beguaranteed against any Manufacturing defects <strong>for</strong> a period of 1 Year from thedate of commissioning. Any parts failing during the Guarantee period shall berepaired / replaced free of charge by the supplier at the Sites.2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!