13.07.2015 Views

RINGSCAFF MODULAR SCAFFOLDING - Scafom

RINGSCAFF MODULAR SCAFFOLDING - Scafom

RINGSCAFF MODULAR SCAFFOLDING - Scafom

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Modular scaffolding <strong>RINGSCAFF</strong>3 Erection of <strong>RINGSCAFF</strong> modular scaffolding3.3 Lead-off adaptersThe lead-off adapters must be fitted onto the base jacks (fig. 3-3).Fig. 3-33.4 LedgersSuitable ledgers must be inserted in the breaker plates of the lead-off adapters using their claws, thensecuring wedges must be lowered and driven home with strokes on the upper edge of the wedge. The resultingbase frame must now be levelled off using a spirit level. This is important to ensure trouble-free erection.A hose spirit level can also be used for levelling (fig. 3-4).Fig. 3-4<strong>Scafom</strong> International BV · Phone +31 495 497204 · Fax +31 495 430676 · Mail info@scafom.com41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!