Modular scaffolding <strong>RINGSCAFF</strong>2 Special provisions2.3.7 DeckingDecking must be secured against unintentional displacement.2.3.8 IdentificationThe components listed under 2.1.4 may only be used if they are marked with the manufacturer’s symbol plusthe last two digits of the year of manufacture. Components that comply with the instructions in this manual andwere manufactured prior to the publication of this manual without these identification marks may also be used.2.3.9 Verification of stabilityThe stability of scaffolds erected with the components described in Chapter 2.1.4 must be verified in eachindividual case, or a structural type analysis must be submitted. The verification of stability is deemed to havebeen provided for the standard designs described in this manual.2.3.10 Standard designsScaffolds are deemed to be of standard design within the scope of these instructions for erection and use ifconstructed along the lines illustrated under point 4. They are dimensioned to cope with working loads accordingto DIN EN 12810/12811. The standard designs may only be used without further verification if the actualworking load incurred does not exceed the maximum loads listed under these norms. In the standard designsdescribed, the working loads have been calculated on the basis of 1.5 scaffolding days simultaneously.2.3.11 Divergence from standard designsIf the scaffolding system is used to build scaffolds that deviate from the standard designs described in thismanual, such divergences must be calculable in accordance with technical construction regulations andbe verified in each individual case. In doing so, other anchoring grids may also be used. Increased loads,caused by– an increase in self-weight– an increase in surfaces exposed to high winds– increased working loadsmust be taken into account down to the ground level plane and up to the tying devices. Moreover, the effect ofbuilder’s hoists and other lifting gear must be considered unless these operate independently of the scaffold.<strong>Scafom</strong> International BV · Phone +31 495 497204 · Fax +31 495 430676 · Mail info@scafom.com23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!