13.07.2015 Views

RINGSCAFF MODULAR SCAFFOLDING - Scafom

RINGSCAFF MODULAR SCAFFOLDING - Scafom

RINGSCAFF MODULAR SCAFFOLDING - Scafom

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Modular scaffolding <strong>RINGSCAFF</strong>2 Special provisions2.2 Use2.2.1 Erection and use of scaffoldingBGI 663 or equivalent local accident prevention regulations apply. Scaffolds are only to be erected, convertedor dismantled by persons who are sufficiently qualified and familiar with the design of the scaffolding system.Erection, conversion and dismantling operations must be permanently supervised. The supervisor’s specialresponsibility is also to check the condition of all components in accordance with Chapter 2.2.2.The contractor must carry out a hazard analysis prior to starting work on scaffolding.2.2.2 Condition of componentsAll components must be checked for perfect condition prior to erection. Defective components must not beused.2.3 Construction2.3.1 General remarks2.3.2 BaseComponents as listed in Chapter 2.1.4 must be used in the erection of scaffolding according to the instructionscontained in this manual. In individual cases, the scaffolding system may be supplemented by steel tubes (tobe connected with couplers) as well as battens and planks. The load bearing capacity of these componentsmust be checked in each individual case.The <strong>RINGSCAFF</strong> modular scaffolding system may only be erected on grounds with sufficient load-bearing capacity.Load-distributing supports such as planks, sleepers or structural steel beams must be placed underneaththe scaffold to stabilize it on insufficiently solid ground.Levelling blocks are necessary when erecting scaffolds on sloping ground. It must be ensured that the baseplates or base jacks rest full-face on the ground to absorb the forces emanating from the scaffold on thehorizontal plane and transmit them to the ground beneath.2.3.3 Height adjustmentFor height adjustment, the base jacks can be extended to a maximum of 0.25 m in the standard designs describedin the following chapters. Extensions above 0.25 m must be verified by separate static analyses in eachindividual case.<strong>Scafom</strong> International BV · Phone +31 495 497204 · Fax +31 495 430676 · Mail info@scafom.com21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!