13.07.2015 Views

Washington Street West watershed - City of Champaign

Washington Street West watershed - City of Champaign

Washington Street West watershed - City of Champaign

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Draft Report<strong>West</strong> <strong>Washington</strong> <strong>Street</strong> Watershed Master PlanGOAL C:Develop alternatives to improveconditions in problem areasDescription:The drainage area served by the <strong>West</strong> <strong>Washington</strong> <strong>Street</strong> storm sewer is entirely developed, witha few open areas near the industrial facilities and at parks. Incorporating flood control solutionsinto the existing <strong>watershed</strong> will require creative options and this Watershed Master Plan aims todevelop multiple options in an attempt to improve the drainage analysis and provide betterrecommendations. The existing conditions XP-SWMM model was modified to estimate howeach option would perform under expected hydrological conditions. Each multi-phase alternativescenario would be subjected to identical hydrological conditions and adjusted so that surfaceflooding for the 10-year, 2-hour storm would not occur at the intersection <strong>of</strong> <strong>West</strong> <strong>Washington</strong>and North Russell, as well as at the other identified areas throughout the <strong>watershed</strong>. Waterquality benefits <strong>of</strong> each alternative were studied on a conceptual level and benefits <strong>of</strong> eachalternative were included in the final analysis.Objectives:1. Modify the existing conditions XP-SWMM model to incorporate the various alternatives intoseparate model scenarios.2. Test the multi-phase improvement scenarios against the 10-year, 2-hour storm to demonstrateno ponding at the intersection <strong>of</strong> <strong>West</strong> <strong>Washington</strong> and North Russell and no surfacesurcharge along the main trunk sewers. Analyze each scenario against the 50-year, 2-hourstorm event to verify the extent <strong>of</strong> flooding and flood routing for large storm events.3. Address the economic and construction feasibility <strong>of</strong> each alternative in the final analysis,with consideration towards phasing and implementation strategy.September 20092-9Clark Dietz, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!