13.07.2015 Views

Guidelines for Implementation of Integrated Water Management ...

Guidelines for Implementation of Integrated Water Management ...

Guidelines for Implementation of Integrated Water Management ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Guideline 1.1b Boundary Ministerial Decree No. 146/2005The western limit:A straight line starting from the point <strong>of</strong> changing the direction <strong>of</strong> Hadus draintowards the west, going southwards and in parallel to the R- bank <strong>of</strong> Bahr Hadus drain till itsintersection with the railway line between Awlad Saker and Mansoura at the bridge km 51.00on Hadus drain.The southern limit:A line starting from bridge at Km 51.00 in Bahr Hadus drain going Eastwards andparallel to the Railway line Awlad Sakr–Mansoura is interested Hanout canal at bridge km14.250 in Awlad Sakr City housing area meeting the left bank <strong>of</strong> Bahr Saft south middle drainat km 12.300 taking the path <strong>of</strong> this drain parallel to its left bank till the start point <strong>of</strong> northmiddle Saft drain with a straight line parallel to its left bank till km 19.00 on Bahr Saft Northdrain.The eastern limit:Starts from the regulator Km 19.00 on Bahr Saft North drain and goes with the Rightbank till its mouth in Bahr Hadus at Km 7.00 northwards.Article FourThe West Shakiya <strong>Water</strong> Resources and Irrigation General Directorate and its Districtsundertake all responsibilities <strong>of</strong> irrigation ,drainage ,groundwater, reuse <strong>of</strong> drainage water <strong>for</strong>irrigation , the operation and maintenance <strong>of</strong> the irrigation and drainage networks and pump stationsand the groundwater wells within the boundaries <strong>of</strong> this G. Directorate and all the administrative andhousing buildings and its districts and its contents , equipment and tools and vehicles become itsownership all within the area served and final boundaries <strong>of</strong> the General Directorate and its Districts.Article FiveThe public Authority <strong>of</strong> drainage projects has to prepare the Ministerial Decrees necessary tomodify the boundaries and areas served by the Drainage <strong>of</strong> North Sharkiya and its districts as well asthe general directorate <strong>of</strong> drainage <strong>of</strong> North Sharkiya within the framework <strong>of</strong> whatever modificationsintroduced by this Decree.Article SixThis decree is put into <strong>for</strong>ce starting from today and all parts concerned have to act accordingly.(Signed by)Minister <strong>of</strong> <strong>Water</strong> Resources and IrrigationDr. Mahmoud Abu Zeid12 LIFE/IWRM/MWRIInternational Resources GroupJanuary 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!