13.07.2015 Views

210-4 Range Control SOP Apr 01

210-4 Range Control SOP Apr 01

210-4 Range Control SOP Apr 01

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FLORIDA NATIONAL GUARDCAMP BLANDING TRAINING SITE<strong>210</strong>-5 RANGE CONTROL STANDARD OPERATION PROCEDURES3.2.2 Safety Waivers: Request for firing which necessitate a waiver must be in writing and submitted aminimum of 45 days in advance of the scheduled day of firing. See AR 385-63 for waiverrequirements and authorization.3.2.3 Demolition, Explosives and Simulators: The use of demolition and explosives in training will beclosely controlled to ensure safe procedures are followed.3.2.3.1 Commander, OIC’s and Safety Officers consult with <strong>Range</strong> <strong>Control</strong> for Current PyroBan Status and will ensure that persons using pyrotechnics or explosive hand fired simulators arethoroughly trained in safe control, preparation and use of these items.3.2.3.2 Demolition and explosive device charge size will be limited depending on type, locationof use and in accordance with regulations and policies.3.2.3.3 Demolition pits will be checked to ensure that they are free of any object which couldbecome a missile if blown out of the pit. Steel cutting charges or any other exceptions must beauthorized and approved in advance.3.2.3.4 Department of the Army Form 2203-R and DA Form 5692-R will be submitted to ASPupon completion of demolition training with a copy provided to the <strong>Range</strong> <strong>Control</strong>.3.2.4 Hand Grenade <strong>Range</strong>s; In addition to published restrictions, the following procedures apply:3.2.4.1 Only one grenade at a time will be thrown in to each bermed impact area, regardless ofthe number of throwing bays being used. Grenades from the same or other bays will not bethrown into the bermed impact area until the OIC or Safety Officer has assured that thepreceding grenade has exploded. Grenade duds will be reported to <strong>Range</strong> <strong>Control</strong> immediately.(Throwing of hand grenades into the bermed impact area containing the dud will ceaseimmediately, and will not be resumed until the EOD has destroyed the dud grenade.) If a dudexists all training is to cease. Personnel will remain under cover or in the throwing bay until the45-minute cook-off period and has ELAPSED. <strong>Range</strong> <strong>Control</strong> personnel will escort allpersonnel from the throwing bays.3.2.4.2 The OIC or RSO will inspect the Hand Grenade Impact Area, after use, and assure thatthe holes and craters generated from grenades are filled in and the impact area is leveled. Dudrates that meet or exceed quantities listed in Appendix B of AR 75-1, will be reported to <strong>Range</strong><strong>Control</strong> and the ASP.3.2.5 Blank Ammunition: Blank ammunition will not be fired at personnel at a distance less than 25meters. The person receiving the ammunition, before using, will assure each round is blankammunition, the ammunition has not been altered or tampered with in any way, and that the grenadecartridges are not being used as blank ammunition. Use of blank ammunition in hand to hand trainingis prohibited.CBTS <strong>210</strong>-5 <strong>Range</strong> <strong>Control</strong> Standard Operating ProceduresRevision Date: <strong>01</strong> Oct 20<strong>01</strong>Page - 17 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!