13.07.2015 Views

PED guidebook main sxn rev6. FINAL.pdf - LGRC DILG 10

PED guidebook main sxn rev6. FINAL.pdf - LGRC DILG 10

PED guidebook main sxn rev6. FINAL.pdf - LGRC DILG 10

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Project Evaluation and Development2.1.1 Develop the log frame for the project. 6 The project proponents, with guidancefrom the <strong>PED</strong> technician, will model the project in matrix form, clearlyspecifying thei. Goal of the sector to which the project belongs,ii. the expected impact of the project that will contribute to meeting this goal,iii. the project’s outputs that will result in the expected impact,iv. and the project’s inputs that are needed to produce the output.v. Important assumptions are stated andvi. a list of verifiable indicators of success is given,vii. together with the proposed strategy to measure accomplishment.2.1.2 Note that the Project Proponent must be able to trace the goal of the projectback to the development goals articulated in the Provincial Development Plan(PDP).Table 1MatrixNarrative Summary Indicators M&E AssumptionsGoal:Purpose:OutputsInputsExample (g): Consider a project that will construct a communal irrigation system. Thelogframe may resemble the following:6 Please refer to the Technical Appendix, pages 12-15, for a more detailed discussion of logical framework analysis.RGEdillon January 200618

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!