13.07.2015 Views

Xi System Installation on Concrete Pads, Runners or Slabs

Xi System Installation on Concrete Pads, Runners or Slabs

Xi System Installation on Concrete Pads, Runners or Slabs

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<str<strong>on</strong>g>Xi</str<strong>on</strong>g> <str<strong>on</strong>g>System</str<strong>on</strong>g> <str<strong>on</strong>g>Installati<strong>on</strong></str<strong>on</strong>g> <strong>on</strong> C<strong>on</strong>crete <strong>Pads</strong>, <strong>Runners</strong> <strong>or</strong> <strong>Slabs</strong>The <str<strong>on</strong>g>Xi</str<strong>on</strong>g> system f<strong>or</strong> poured c<strong>on</strong>crete applies to c<strong>on</strong>crete footers, runners, ribb<strong>on</strong>s, and slabs. Minimum size of c<strong>on</strong>creteper <str<strong>on</strong>g>Xi</str<strong>on</strong>g> pier in Fl<strong>or</strong>ida is 18”x18”x8” <strong>or</strong> 20” diameter x 8” deep <strong>or</strong> a slab 3-1/2” deep. C<strong>on</strong>crete must be sufficientlycured and set to accommodate an anch<strong>or</strong> bolt to its’ full load resistance.1. Determine locati<strong>on</strong> of pier sets where the <str<strong>on</strong>g>Xi</str<strong>on</strong>g> systems will be located.2. Place <str<strong>on</strong>g>Xi</str<strong>on</strong>g>/Vect<strong>or</strong> c<strong>on</strong>crete pan where pier will be located. Turned up edge will face to the outside of the home.3. Build pier with c<strong>on</strong>crete blocks centered <strong>on</strong> top of the pad acc<strong>or</strong>ding to state, local <strong>or</strong> manufacturers guide lines.4. Drill two 3/8” x 3” deep holes in c<strong>on</strong>crete using holes in galvanized pan as a guide.5. Place tie bracket <strong>on</strong> inside of pier, facing toward the opposite beam, with the “flush” side of the tie brackettowards the block pier.6. Put a washer and nut <strong>on</strong> each of the 3/8” x 3-1/2”wedge anch<strong>or</strong>s. The nut should be screwed <strong>on</strong>C<strong>on</strong>crete LSDenough to have <strong>on</strong>e <strong>or</strong> two threads showing <strong>on</strong> thetop of the bolt.7. Line up the hole in the inside tie bracket with thedrilled holes in the pad & c<strong>on</strong>crete and insert thewedge anch<strong>or</strong>s. Using a hammer, tap the wedgebolts into the holes, through the bracket & pad,leaving the washer/nut flush with the bottom ofthe bracket. Using a 9/16” socket wrench, tightenthe wedge/anch<strong>or</strong> bolt, securing the tie bracket tothe c<strong>on</strong>crete.8. Follow steps 7 - 10 in ground instructi<strong>on</strong>sBlock Pier C<strong>on</strong>crete <str<strong>on</strong>g>System</str<strong>on</strong>g>s P/N’s#59046 <str<strong>on</strong>g>Xi</str<strong>on</strong>g>, C<strong>on</strong>crete Single Block#59047 <str<strong>on</strong>g>Xi</str<strong>on</strong>g>, C<strong>on</strong>crete Double Block#59315 Lateral 5’ Strut w/hardware#59318 Lateral 6’ Strut w/hardware1-1/2" Tube4 - 1/4"x3/4"Self Tapping Screws(2 per side)1-3/4" TubeGalvanizedSteel Pad091902,410


LSD/L<strong>on</strong>gitudinal <str<strong>on</strong>g>Installati<strong>on</strong></str<strong>on</strong>g>1. Place and build pier as above2. Use LSD hardware kit #590233. Drill 3/8” x 3” Hole into c<strong>on</strong>crete through holes in pan <strong>on</strong> each l<strong>on</strong>gitudinal side of block pier4. Place tie brackets <strong>on</strong> each side of pier, with the “flush” side of the tie bracket towards the block pier.5. Put a washer and nut <strong>on</strong> each of the 3/8” x 3-1/2” wedge anch<strong>or</strong>s. The nut should be screwed <strong>on</strong> enoughto have <strong>on</strong>e <strong>or</strong> two threads showing <strong>on</strong> the top of the bolt.6. Line up the hole in the inside tie bracket with the drilled holes in the pad & c<strong>on</strong>crete and insert thewedge anch<strong>or</strong>s. Using a hammer, tap the wedge bolts into the holes, through the bracket & pad,leaving the washer/nut flush with the bottom of the bracket. Using a 9/16” socket wrench, tighten thewedge/anch<strong>or</strong> bolt, securing the tie bracket to the c<strong>on</strong>crete.7. Attach frame brackets to I-beam <strong>on</strong> each side of pier.8. Attach strut to the tie bracket at base and I-beam brackets with bolts provided. Struts must be at 45˚ <strong>or</strong>less, tighten all bolts/nuts.LSD/L<strong>on</strong>gitudinal Lateral Strut ComboVect<strong>or</strong>/<str<strong>on</strong>g>Xi</str<strong>on</strong>g>C<strong>on</strong>cretePadC<strong>on</strong>crete091902,410

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!